Fast track project with 2100 tons on-line in 2.5 months with next 2100 tons 3 months later.
Additions included chillers, pumps, cooling towers, & all new controls for entire 14, 700 ton plant.
Commissioning of entire plant over 240 I/O points 12″ to 30″ piping and shop fabrication.
Fast track design/build, plant startup in 5 months.
Savings of > $500k vs Owner design program.
Complete plant replacement, equipment, controls.
Temporary chillers installed during construction.
New controls, sequences, and commissioning.
Construction at 1M SF occupied hospital.
12,000 gpm pumping capacity.
1000 tons of temporary chillers during construction.
8" to 30" piping and shop fabrication.